News

  Oct 2009 Bopp & Reuther NEWS 10 / 2009
Bopp & Reuther -Wins major order from Chinese plant engineering company !!!! -Bopp & Reuther SR GmbH has shipped the first batch of safety valves to the Sinopec Engineering Incorporation... more...
 
  Aug 2009 Bopp & Reuther NEWS 08 / 2009
Bopp & Reuther - Exhibitor at ACHEMA 2009 - The 29th. International Exhibition and Congress for Chemical Technology, Environmental Protection and Biotechnology - For Bopp &... more...
 
  Juli 2009 AREVA TOP Supplier
On July 1, 2009 Bopp & Reuther received the “Top AREVA Supplier” award from AREVA (a world energy expert in nuclear power generation). This point out the strong partnership... more...
 
  Apr 2009 Bopp & Reuther designed and developed V and W orifices
Bopp & Reuther Design & Development:
V and W orifices for the API range
- The Si 8x product range has been extended by adding the diameters 204.5 mm (V) and
245 mm (W). - The maximum set... more...
 
  Apr 2007 Nuclear Live Steam Large Scale Project in Korea
At the end of 2006 Bopp & Reuther has been awarded another large scale project in Korea since they were providing four pressurised water reactors in 2005 in India with the newly developed safety... more...
 
  March 2007 Valve Seat Reconstruction with a Welding Robot
Almost every safety valve has to be reconstructed after a certain period of utilisation. Now, a new procedure replaces the present manual reconstruction: The valve seat reconstruction of the... more...
 
  Jan 2007 Strong Growth in Petrochemical Projects
As a result of increased orders and awards of large scale projects Bopp & Reuther SR GmbH is reaching strong growth in the Petrochemical Industry. ABB Lummus Global has been awarded a contract... more...
 
  Jan 2007 Bopp & Reuther Delivers Safety Valves for Bayernoil Project ISAR
As a reaction to the changing market conditions BAYERNOIL has started its project ISAR. With an investment of about 330 million euros ISAR is the major project of BAYERNOIL up to now. The core of the... more...
 
  ASME Sec. I – Manufacturer's licensing
... more...
 
  ASME Sec. III – Product licensing
... more...
 
  ASME Survey for ASME Sec. III – Manufacturer's licensing (N-, NV-, NPT-stamp)
... more...
 


Copyright © 2005 Bopp & Reuther Sicherheits- und Regelarmaturen | Impressum/Disclaimer | Sitemap | Design by net-solution


Bopp & Reuther Sicherheits- und Regelarmaturen GmbH, Carl-Reuther-Straße 1, D-68305 Mannheim
Geschäftsführer: Dipl. Ing. Christel Halm-Schmidt
Sitz der Gesellschaft: Mannheim, HRB 5074, Steuer-Nr. 35001/03156, UstId-Nr. DE 811115106
E-Mail: Sales@SR.BoppuReuther.com, Tel. +49 (0)621 / 749-0, Fax: +49 (0)621 / 749-1604